Tender For annual rate: 2025-26 rates of supplying, stacking bituminious materials and labour work on various roads of vyara and dolvan taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accord
Tender For annual rate : 2025-26 rates of supplying , stacking bituminious materials and labour work on various roads of uchchhal taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance w
Tender For annual rate : 2025-26 rates of supplying, stacking bituminous materials and labour work on various roads of valod taluka dist- tapi. - providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and manual laying including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and mannual finish etc. complete. (manual laying), providing and laying bituminious base course 37.5 mm thick compacted in single layer asphalt vg-30 grade at 1.99 percentage by weight of mix for mixing and 2.5 kg/10 smt asphalt vg-30 for tack coat and using b.t. chips of required gradation including cleaning and heating asphalt, premix material by drum mix process in proper gradation and laying with paver finisher including rolling and consolidation with 8-10 tonne vibratory roller and providing all material equipment, tools, and plants, fire wood, oil, kerosene labour charges etc. complete using contractors own machinaries, drum mix plant and paver finisher etc. complete. (paver finish), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by manual laying and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (manual laying), providing, laying and rolling 37.5 mm compacted thick b.m. in one layer with b.t. aggregate as specified and using bitumen vg10 for tack coat at the rate of 2.5kg/10sqm and using bitumen vg10 for mixing with aggregate at the rate of 3.4percentage i.e. 34kg/m.t. of total mix including heating and mixing in drum mix plant and transporting spreading the same by paver finisher and cosolidation with vibratory roller including necessary firewood, oil, lubricants, labour charges, using contractors own drum mix plant, machineries and eqipment, tools etc.complete in accordance with the requirement of specification. (paver finish), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by manual laying and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with the requirement. (manual laying), providing, laying 25mm thick compacted bituminous carpet considering 0.66 cmt./10smt. stone chips for one m.ton as per specification, using the asphalt at rate 33.60 kg/m.ton (i.e. 3.36percentage by weight of total mix) for mixing and asphalt for tack coat at rate 2.5 kg/ 10sq.mt. including heating and mixing the asphalt and stone aggregates by continuous batching of drum mix plant and transporting and spreading the same by paver finsiher and consoli-dation with vibratory roller with necessary equipments oil, kerosene,fire wood labour charges etc comp.with contractors own machineries and equipment tools etc. complete in accordance with t
Tender For material supply for different maintanance work in rajpur gomtipur area inamraiwadi ward of east zone - supplying good quality of bricks in municipal store. including loading and unloading as directed. bricks should be good in quality & free from moisture & other impurites. the work in general is carried out as per inst. of eng. in charge., supplying good quality river sand in municipal store. including loading and unloading as directed. sand should be good in quality & free from all organic & other impurites. the work in general is carried out as per inst. of eng. in charge.( as per mr ), supplying of good quality of cement for drainage , stone paving, paver block and other maintenance work by department at municipal store ext.comp. (app.rate ), providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site,, laying in uniform layers in sub? base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per codal provision., production & supply of wmm, laying of wmm
Tender For annual rate contract work regarding laying of paver blocks in various societies, chalis, villages and other places in east zone vastral wards under councilor budget, legislature budget and other budgets.
Tender For material supplay for different maintanance work in shivanadngar,satyamnagar, rabari colony and bhilvada area in amraiwadi ward of east zone-supplying good quality of bricks in municipal store. including loading and unloading as directed. bricks should be good in quality & free from moisture & other impurites. the work in general is carried out as per inst. of eng. in charge.supplying good quality river sand in municipal store. including loading and unloading as directed. sand should be good in quality & free from all organic & other impurites. the work in general is carried out as per inst. of eng. in charge. (as per mr)supplying of good quality of cement for drainage, stone paving, paver block and other maintenance work by department at municipal store ext.comp. (app.rate)providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per codal provision.production & supply of wmmlaying of wmm
Tender For material supply for different maintanance work in khokhra,gamtal area inamraiwadi ward of east zone.-supplying good quality of bricks in municipal store. including loading and unloading as directed. bricks should be good in quality & free from moisture & other impurites. the work in general is carried out as per inst. of eng, in charge.supplying good quality river sand in municipal store. including loading and unloading as directed. sand should be good in quality & free from all organic & other impurites. the work in general is carried out as per inst. of eng. in charge. (as per mr)supplying of good quality of cement for drainage, stone paving, paver block and other maintenance work by department at municipal store ext.comp. (app.rate)providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per codal provision.production & supply of wmmlaying of wmm
Tender For providing and layingpaver patta in various roads in bardoli sub division dist.surat. (providing and laying b.m., m.s.s. work in scattered length) (mahuva section)
Tender For providing and layingpaver patta in various roads in bardoli sub division, dist.surat (providing and laying b.m., m.s.s. work in scattered length) (bardoli section)